Qiaoqi Dam

Dam in Ya'an, Sichuan
30°41′31.48″N 102°44′48.44″E / 30.6920778°N 102.7467889°E / 30.6920778; 102.7467889PurposePowerStatusOperationalConstruction began2002Opening date2007; 17 years ago (2007)Dam and spillwaysType of damEmbankment, rock-fillImpoundsBaoxinghe RiverHeight123 m (404 ft)Length452.7 m (1,485 ft)Width (crest)10 m (33 ft)Width (base)450 m (1,480 ft)ReservoirTotal capacity223,000,000 m3 (181,000 acre⋅ft)Qiaoqi Hydropower StationCoordinates30°32′53.31″N 102°39′7.93″E / 30.5481417°N 102.6522028°E / 30.5481417; 102.6522028Commission date2007TypeConventional, diversionHydraulic head550 m (1,800 ft)Turbines3 x 80 MW Francis-typeInstalled capacity240 MW

The Qiaoqi Dam is a rock-fill embankment dam on the Baoxinghe River in Baoxing County of Sichuan Province, China. The primary purpose of the dam is hydroelectric power generation. Construction on the project began in October 2002 and its 240 MW power station was commissioned in 2007.[1] Water from the reservoir is diverted south to the power station via a 18.676 km (11.605 mi) long head-race tunnel and penstock. The power station is located on the north bank of the main stem Baoxing River. The drop in elevation between the reservoir and power station afford a hydraulic head of about 550 m (1,800 ft).[2]

See also

  • flagChina portal
  • iconWater portal
  • iconRenewable energy portal

References

  1. ^ "Qiaoqi hydropower project (Gravel Soil core rockfill dam) (硗碛水电站大坝工程(砾石土直心墙堆石坝))" (in Chinese). Power China. 28 July 2009. Archived from the original on 8 December 2015. Retrieved 19 June 2014.
  2. ^ "On Qiaoqi diversion tunnel rock rock handling different" (in Chinese). Flying Crown. Retrieved 19 June 2014.