Commuter rail system in Chongqing, China
4 ft 8+1⁄2 in)
Electrification | 25 kV AC overhead line |
---|
Top speed | 100 km/h (62 mph) – 200 km/h (120 mph) |
Chongqing Suburban Railway |
---|
|
Simplified Chinese | 重庆市郊铁路 |
---|
Traditional Chinese | 重慶市郊鐵路 |
---|
Transcriptions |
---|
Standard Mandarin |
---|
Hanyu Pinyin | Chóngqìng Shìjiāo Tiělù |
---|
other Mandarin |
---|
Sichuanese Pinyin | Cong2qin4 Si4jiao1 Tie2nu4 |
---|
|
|
Chongqing Suburban Railway is a commuter rail transit system in construction in Chongqing, China. According to the Comprehensive Transport Plan of Chongqing Main City Zone, the system will have a total of 14 lines.
Lines under construction
Planned Opening | Project | Terminus | Top speed | Type | Length (km) | New stations | Start of construction | Status | Notes |
2021 | S5 [Note 1] | Phase I | Tiaodeng | Shengquansi | 120 km/h (75 mph) | Double-track | 26.7 | 5 | 2014 | In full construction | [1] |
TBA | S1 | Yuhe line | Moxinpo | Weituo | 160 km/h (99 mph) | Double-track | 49.5 | 5 | 2015 | In full construction |
2022 | heyong | Heyong line | Huangniba | Yongchuan South | 160 km/h (99 mph) | Single-track | 95.0 | 8 | 2017 | Under preparation |
2023 | S2 | Bitong line | Bishan | Tongliang[2] | 160 km/h (99 mph) | Double-track | 37.5[2] | 9[2] | 2019 | In full construction | [2] |
2025 | S5 [Note 1] | Phase II | Shengquansi | Dingshan | 120 km/h (75 mph) | Double-track | 4.61 | 2 | 2020 | Under preparation | [1] |
Lines planned
Lines | Terminals | Stations | Length (km) |
S1 | Moxinpo | Weituo | 8 | 610 |
S2 | Bishan | Tongnan | 11 |
S3 | Baishiyi | Dazu | 8 |
S4 | Jiulongyuan | Rongchang | 8 |
S5 [Note 1] | Tiaodeng | Yudong | 17 |
S6 | Chongqing East | Wansheng | 5 |
S7 | Chongqing East | Mount Jinfo | 5 |
S8 | Fusheng | Fulin North | 7 |
S9 | Guojiatuo | Changshou North | 4 |
heyong | Huangniba | Yongchuan South | 13 | Unknown |
r | Tiaodeng | Guojiatuo | 6 | 154 |
r | Baishiyi | Chongqing East | 4 |
r | Moxinpo | Fusheng | 3 |
Total | 99 | Unknown |
See also
References
- ^ a b "重点项目". 重庆铁路(集团)有限公司 (in Chinese (China)). Retrieved April 2, 2017.
- ^ a b c d "璧铜线开工 璧铜线设站9座 新型快线车从铜梁一小时飙拢解放碑". November 29, 2019.
Notes
- ^ a b c Through service with Line 5 (Chongqing Rail Transit)